Inspect spending
Open Usage, select the period and available grouping, and inspect the currency, provider and allocation information alongside the total. The overview’s month-to-date period uses the current UTC month. A provider’s reported cost, a runtime token estimate and a project allocation are different measures; do not add overlapping figures together. Refresh before investigating a new change. Missing, stale or unallocated provider data limits what the totals establish; it is not evidence of zero spend. Review source status before reporting a project total. The agent cost guidance and Lakehouse cost guidance explain these measures.Set a project LLM budget
An organization Owner can open Billing → Budgets:- Choose New budget, select the Project, and enter the Monthly LLM budget and Currency.
- Decide whether to enable Stop new LLM usage when this budget is reached. Review the effect with the project’s users before changing it.
- Choose Save budget, then check the saved amount, currency and status. Use Edit budget beside an existing project to change it.
100 in USD, enter those values and verify the saved budget. This is an input example, not a recommended spend limit.
With the stop option enabled, an in-flight response may finish and a subsequent model call can be blocked. Without it, usage continues after alerts. This budget covers AgentOps LLM usage; it is not a cap on every cloud charge. Projects without a project budget are shown as unlimited, though an organization-level protection policy can still apply.